Jack up rig jacking system pdf

Tsc jacking systems can be configured to suit any other liftboat and jackup rig design. Perisais first jack up drilling rig is a ppl pacific class 400 with technologically advanced drilling capabilities. Each component of the system has been designed for high reliability and fieldproven performance. The development of new systems involving new equipment and new methods for personnel.

Jackup rigs were also used for maintenance and to meet many other needs in the oil and gas industry. The jackup is maneuvered selfpropelled or by towing into location with its legs up and the hull floating on the water. Pdf failure analysis of a pinion of the jacking system of a. Yoke and pin jacking systems utilize hydraulic rams to jack the rig up in stages, using slots on the legs to locate the. These rigs are integrated and very compact units using singlestage cylinders to allow jacking from shafts not much longer than the tunnelling machine. Elevating system of jack up rigs drilling formulas and drilling. In offshore mobile jack up rig, platforms are generally supported by movable jacking system where strength of rack and pinion are very crucial in determining the design life of the superstructure. A jacking system 4 is described for a leg 3 of a jackup platform 1. Having all drive disciplines under one roof, hydraulic and electric concepts have. Leg jacking systems are examined, and the pinions and gears of the climbing pinion. Fixed jacking system a jacking system where the gears are connected directly to the jack house. The jack up is maneuvered selfpropelled or by towing into. Jack up drilling rig drilling rig oil well avaliacao.

Jack up rig free download as powerpoint presentation. Analysis and improvement of jacking systems for jackup rig scribd. Upon arrival at the drilling location, the legs are jacked down onto the seafloor, preloaded to securely drive them. Confidence in their use in these environments requires. In offshore mobile jackup rig, platforms are generally supported by movable jacking system where strength of rack and pinion are very crucial in determining the design life. The new jack up rig comes with an increased accommodation for 150 men, equipped with the latest drilling equipment and an offline pipe handling for a simultaneous operations support. Jack up certificates, manuals, publications, logs and records appendix d. Dynamic amplification of jackup platforms subjected to. There the legs are cranked downward by a rackandpinion gearing system until they encounter the. Upon arrival at the work location, the legs are jacked down onto the seafloor. The purpose of the visit was to carry out a full condition survey of the primary drilling equipment, mud system, well control. Retorqueing can be performed automatically by the vsd control. Jacking systems are widely used in the offshore construction and drilling industries, such as in jackup vessels for oil drilling and offshore wind turbine installation.

The jackup system is a synchronous multipoint lifting system. For the above modifications, the jackup drilling rig has been analyzed. Different types of rack systems on a truss design leg, the racks are always attached to or part of the chords. This is a challenge since in many cases the design of the jackup legs rack and pinion system is bumping up against the technical limits of the materials involved. Single sided rack a system that uses a rack with teeth on only. Heavy seas, strong current, and large tidal ranges can make marine projects dangerous, if not impossible, from a conventional floating platform.

Drilling vessel description designed and constructed by bethlehem steel corporation 1974 completely remanufactured as a cantileverable drilling rig in. Tsc jacking systems range from sj220, sj350h, sj450, sj750 and sj suitable for harshenvironment liftboat or jack up rigs with water depth to 500ft. Four separate consultants are to study four different jackups, as shown in table 11. Analysis and improvement of jacking systems for jackup rig free download as pdf file. Dynamic amplification of jackup platforms subjected to nongaussian wave loads. This upgrade will enhance the inspection and analysis of the 375 kip mlt jacking system. Dynamic amplification of jackup platforms subjected to non. Since the first jackup was built in 1954, jackups have become the most popular type of mobile offshore drilling unit modu for offshore exploration and development purposes. Each independent yoke is connected to a jack up structure by at least one vertically arranged double acting actuator 8 a 8 d. A selfcontained combination drilling rig and floating barge, fitted with long support legs that can be raised or lowered independently of each other. The jackup, as it is known informally, is towed onto location with its legs up and the barge section floating on the water. A recommendation for the provision of two jacking engineers in circumstances likely to involve. This report addresses the foundations of jackup rigs, with the overall objective of determining current knowledge.

Hines and his people have to work within the constraints of space and existing capacity when retrofitting a new system onto an existing rig. Punchthrough it is very important to establish the sea bed characteristic at the proposed drilling location. As instructed by fode ltd, we attended the jack up rig thule power which was jacked up in a standby position at the outer section of the sharjah harbor in sharjah uae. Nonlinear analysis of jackup structures subjected to. When it comes to jacking systems rexroth develops drive and control systems for various jacking system types and sizes, which are used in numerous self elevating platforms seps such as jackp rigs, jack up vessels and jack up barges. This mat transfers the weight of the jack up through the large surface of the mat. Pacific class 400 is the latest proprietary jackup design by ppl shipyard following the success of pacific class 375 deep drilling jackup rig launched in 2004. In order to get uniform and reliable site approval procedures, a. Tsc jacking systems can be configured to suit any other liftboat and jack up rig design requirement and specific customer needs. The successful use of the jacking unit system proved that it was possible to complete the campaign as a standalone operation without the requirement to mobilize a jackup drilling rig or barge. Jacking system bethlehem, electrohydraulic yoke and pin system.

Jacking system for a jackup vessel for installation of. It can therefore be expected to encounter a range of water depths, environmental load conditions and soil types. Attached you can find the specs and all the information. The jacking system of jackup unit roughly is divided into two big classes at present. Pdf failure analysis of a pinion of the jacking system. Since that time, in waters up to about 400 feet deep, rackandpiniontype jackup drilling rigs have been the dominant type of offshore oil and natural gas drilling rig. The term jackup covers a large variety of offshore structures from small. Than the jacking system of hydraulic jack jacking type. It is possible to bring the jack up very close to the production platform without undermining the platform. A jack up rig is fitted with long support legs that can be raised or lowered. Jack up barges and jack up vessels for sale sun machinery. The first one is the rig atlantic 7 which is abs certified 2019 and ready to work. Each independent yoke is connected to a jackup structure by at least one vertically arranged double acting actuator 8 a8 d.

Guidelines for jackup rigs with particular reference to foundation integrity prepared by msl engineering limited for the. A jack up rig is typically used at a dozen or more sites during its service life. Jackup rigs are mobile, selfelevating drilling and workover platforms equipped with legs that can be lowered to the ocean floor until a foundation is established to support the hull, which contains the drilling andor workover equipment, jacking system, crew quarters, loading and unloading facilities, storage areas for bulk and liquid materials, helicopter landing deck, and other related. Jack up mat supported type for very soft seabed formations where high leg penetration is anticipated and nonacceptable, a matsupported ju can be mobilised. Platform rig mode completely autonomous from the jack up. Guidance for the positioning of dynamically positioned dp. A 1600 tonne compact jacking rig is seen installing a 3020mm o. Firstly, let start with the jacking system, to lift and lower the hull, every jack up. Positioning the jackup system on top of an spmt provides a hydraulic solution for lifting, transporting and installing a prebuilt. Tsc can offer jacking system used for the most jackups in the world. This system is easy to activate, easy to cycle up and down, and it is easy to change out motors and other equipment yokeandpin system. Titans jackups jackup barges operate in the most demanding marine environments.

Component analysis, metallographic examination and hardness test were performed respectively for a failed pinion and a new rack of the jacking system of a jackup platform. Guidelines for the selection and operation of jackups in. Jack up rig atlantic 7 exensco 69 and jack up pacific 12 expride wisconsin direct owners are authorized us to find a serious buyers for these units. For titan and its clients, the karlissa a and karlissa b jackup barges have overcome these challenges and.

If any significant structural nonlinearities are present in the system then such non. Guidelines for jackuprigdesign with foundation guidance. Jackup rigs have been the most popular and numerous of various mobile types of rigs in existence. The jacking system comprises at least three independent yokes 7 a 7 d.

Jul 16, 2014 tug boats towing a jack up rig into position how the offshore drilling industry works. Guidelines for offshore structural reliability page no. A jackup rig is typically used at a dozen or more sites during its service life. Drilling rigs on land are extremely simple but, because a jackup has to be mobile and seagoing, it needs facilities to generate its own power and water, and house the inhabitants that keep it running. A jacking system 4 is described for a leg 3 of a jack up platform 1. Jacking units each jacking unit consists of a special design 7 teeth pinion driven. There were over 500 jackup drilling rigs in operation at the end of 20. The cantilever assembly with drill floor and pipe rack is also capable of skid off operation. Let 116c jackup kfels bclass jackup phase 2 benchmarking of iso 199051 report no. Nonlinear analysis of jackup structures subjected to random waves a thesis submitted for the degree of doctor of philosophy mark jason cassidy new college, oxford trinity term 1999 there is a steadily increasing demand for the use of jackup units in deeper water and harsher environments. Pdf a case study of rebuilding a jackup researchgate. Perisais first jackup drilling rig is a ppl pacific class 400 with technologically advanced drilling capabilities. Jack up rigs jack up rigs are mobile, selfelevating drilling and workover platforms equipped with legs that can be lowered to the ocean floor until a foundation is established to support the hull, which contains the drilling andor workover equipment, jacking system, crew quarters, loading and unloading facilities, storage areas for bulk and.

Currently, tsc is one the worldwide first tier jacking system manufacturers globally recognized. As instructed by fode ltd, we attended the jackup rig thule power which was jacked up in a standby position at the outer section of the sharjah harbor in sharjah uae. Allowable contact stresses in jacking gear units used in. Rig configuration the rig package drill floor, mud pumps, mud tanks. To reduce downtime, allrig designed innovative polycarbonate cleardrop covers. While exploration wells can be drilled with drilling slot jackups, the rig can also be jacked up over another smaller facility, drilling through its hull. Offshore drilling is very much an upstream activity.

An introduction to offshore drilling and jackup rigs. The survey should give the sea floor penetration to be expected at that location for this geology. Dnvglrp0075 inspection and maintenance of jacking systems. Guidelines for the selection and operation of jackups in the. The cantilever assembly with drill floor and pipe rack is also capable of. The initial design case which was considered was a jacking system of similar. The jack up type drilling rig is a barge much as the previous lay barges, but with the introduction of structural legs that could be lowered to the sea floor. Tsc jacking systems range from sj220, sj350h, sj450, sj750 and sj suitable for harshenvironment liftboat or jackup rigs with water depth to 500ft. Each independent yoke is connected to a jackup structure by at least one vertically arranged double acting actuator 8 a 8 d. Prejacking dp checklist engine room this should be completed by the engineers to confirm that the jacking and dp systems are operational prior to commencing dp operations.

A jackup rig is a barge fitted with long support legs that can be raised or lowered. Their knowledge covers the lubrication requirements of jacking systems and they can generally discern the normal jacking sounds when the system is being operated. A jackup drilling rig is an example of a mobile offshore drilling unit modu. The jacking system comprises at least three independent yokes 7 a7 d. The range of jacking systems suits the gustomsc cj and ng series and can be easily customized to any other jack up rig design. Case history replaced rig, removed casing from nine subsea. Tug boats towing a jack up rig into position how the offshore drilling industry works. Nonlinear analysis of jackup structures subjected to random. This can be used for either jacking up or jacking down.

Pacific class 400 is the latest proprietary jack up design by ppl shipyard following the success of pacific class 375 deep drilling jack up rig launched in 2004. Us8425155b2 jacking system for a leg of a jackup platform. Jackup rigs, case studies, oil and gas, marine industry. For each candidate site, an assessment is conducted to determine the suitability of the unit for the site and to provide data for the installation.

A typical modern drilling jack up is capable of working in harsh environments wave heights up to 80 ft, wind speeds in excess of 100 knots in water depths up to 500 feet. In order to get uniform and reliable site approval procedures, a large study was initiated by a group of companies involved in jack up design and operations. The resulting linear dynamic system is then solved. Transparency provides the possibility to conduct continuous visual inspection during operation. Pdf contact fatigue life of a jacking pinion for jackup rig.

Nov offset derrick, 160 ft h with 35 ft x 35 ft base and a 18 ft x 12 ft top. Feb 03, 2010 this video explains the mechanism of offshore jack up rigs. This is a floating but not selfpropelled platform with legs that can be lifted high off the seafloor while the platform is towed to the drilling site. The range of jacking systems suits the gustomsc cj and ng series and can be easily customized to any other jackup rig design. Jackup certificates, manuals, publications, logs and records appendix d.

Allowable contact stresses in jacking gear units used in the. Nonlinear analysis of jack up structures subjected to random waves a thesis submitted for the degree of doctor of philosophy mark jason cassidy new college, oxford trinity term 1999 there is a steadily increasing demand for the use of jack up units in deeper water and harsher environments. The gustomsc jacking system offers safety, minimum maintenance and a variety of outstanding features from an operational point of view. Tsc can offer jacking system used for the most jack up s in the world.

934 93 119 19 1278 1108 725 1020 276 696 1219 230 186 587 1044 988 682 1252 290 942 422 366 1358 476 266 855 198 1237 646 460 1380 1464 472 882 1324 1305 1312 1344 287 23 1023 428 28 105 546 597 391